Elected officials celebrate new parking lot

Elected officials celebrate new parking lot

Mayor Margot Garant was joined with all the different groups who made the new Barnum Avenue parking lot possible this week at a official “ribbon cutting.” Photo by Julianne Mosher

The Barnum Avenue parking lot is officially open and ready to be used. 

As part of the village’s downtown revitalization project, the lot was upgraded to include 46 new parking spaces, an electric vehicle charging station and filtration system to mitigate flooding and stormwater runoff. 

On Tuesday, May 11, village officials, along with the Port Jefferson Chamber of Commerce and representatives from the county and state, celebrated its grand opening.

“We are very, very proud of this new parking lot,” said Mayor Margot Garant. “This is the first new parking lot in the Village of Port Jefferson in over 50 years. I think that’s amazing.”

And it started about six years ago when there was a vision to remove an eyesore and put in something new. 

Located east of the Joe Erland baseball field, an old, vacant building was once located on the property. 

The Barnum Avenue parking lot. Photo by Julianne Mosher

The several-year-long process to remove the building, clean it up and turn it into a free municipal lot that is futuristic in its amenities finally came to fruition in March of this year. 

The new 32,000-square-foot lot includes 46 new spaces oriented diagonally, including two handicap spots and two EV charging stations. The lot has a one-way entrance, to help alleviate traffic congestion. 

Almost entirely technology-driven, the lot is free to everyone — all a visitor has to do is register with the barcode scan. 

“We’re trying to encourage most of our merchants and their employees to park here for free to keep all the high proximity spots available for patrons,” she said. “That way, they can have a better turnover at your shop or your restaurant.”

Garant added that last week, the village had over 4,800 parking sessions with a revenue just under $12,000.

“That means we are back to a pre-pandemic number, folks,” she said. 

The lot came to be thanks to a $200,000 jumpstart grant from Suffolk County back in 2019. The funding also helped make the lot eco-friendly, adding bioswales bordering the foot entrance on Barnum Avenue to aid in flood mitigation. Those bioswales help with stormwater runoff.

“Being conscious of stormwater runoff, and what it can do — the damage it can cause to the harbor — and making sure that when we add asphalt, we are collecting the water and it’s not bringing contaminants into our bays and waterways, that was critically important to this project,” said Suffolk County Legislator Kara Hahn (D-Setauket).

Overnight parking not permitted and will be tracked.