Brookhaven Finalizes Repaving Lower Rocky Road
Brookhaven Town Highway Superintendent Daniel Losquadro (R) and Councilwoman Jane Bonner (R-Rocky Point) announced the complete resurfacing of Lower Rocky Point Road from Woodhull Landing Road to Rocky Point Landing Road, as well as Hagerman Landing Road.
Residents have noticed the repaving of the thoroughfare over the past few weeks, which included some need for cars to take detours to avoid construction. Officials said in a press release that the paving project included the milling of nearly 38,000 square yards of roadway, before 4,400 tons of asphalt were put down on the roadway. The total cost for this paving project was approximately $448,300, a portion of which, $138,643, was funded by a Community Development Block Grant.
Losquadro called the road “a very busy, main thoroughfare,” adding, “I am glad we were able to include it, along with Hagerman Landing Road, in our 2020 paving season.”
Bonner said Lower Rocky Point Road is one of the most traveled in her council district.
“This road and Hagerman Landing Road are much safer for drivers, bike riders and pedestrians,” she said.